Ruba DigitalBuild progress for JW Corporation, prepared by TMC

Ruba Digital build progress

How much of the BRD and the SDD the application does today, measured against the code on 2 November 2026. Lead capture is the furthest along. The modules from the verification visit to recovery have not started, and no integration is connected to a live system yet.

How complete is the build

BRD v1.3

The business requirements. Requirements the SDD replaces are left out.

Without integrations — — of — requirements
With integrations — — of — requirements

Release 1 Must-haves: — without integrations, — with them.

SDD v1.6

The solution design, which governs the build where it differs from the BRD.

Without integrations — — of — features
With integrations — — of — features

The SDD groups each later module into one feature, where the BRD lists many requirements, so its figure runs higher.

Complete means fully built plus half of what is partly built. With integrations, an exchange with Dynamics 365, Web.HR, payments or SMS counts as done only once it works against the live system.

Where the work stands

BRD by workstream

Share of each workstream's requirements that is done.

Without integrations With integrations

SDD by module

Each module's features by status, with the share done at the end of the bar.

Built Partly built Built differently, to rework Not started

Integration features that run against a stand-in count as not started until they are connected live.

This sprint and what comes next

Sprint 2

— done, — in progress and — not started.

TicketWorkState

Milestones

MilestoneDatesState

Integrations

SystemStateNote

How these figures are measured

  • Each BRD requirement and SDD feature was compared with the code and marked built, partly built, built differently from the SDD, or not started. The code was read, not tested.
  • Complete is built plus half of partly built, over everything measured. A feature built differently from the SDD counts as half, since it needs rework.
  • Without integrations leaves out the exchanges with Dynamics 365, Web.HR, payments, SMS, Maps and Satori. With integrations counts them as not done until each works against the live system.
  • BRD requirements that the SDD replaces are left out of the BRD figures.